![Rohde & Schwarz 1323.0012.03 User Manual Download Page 925](http://html1.mh-extra.com/html/rohde-and-schwarz/1323-0012-03/1323-0012-03_user-manual_1477777925.webp)
Command Reference
R&S
®
ZNL/ZNLE
925
User Manual 1178.5966.02 ─ 07
[SENSe:]CORRection:CKIT:INSTall
<CalKitFile>
Loads cal kit data from a specified R&S ZVR cal kit file.
Setting parameters:
<CalKitFile>
String parameter to specify the name and directory of the cal kit
file to be loaded.
Note:
The loaded file must be a R&S ZVR-specific cal kit file
with the extension
*.ck
. VNA cal kit files (
*.calkit
) can be
imported using the
kit files can be imported manually and converted into
*.calkit
files.
Example:
CORR:CKIT:INST 'C:\Users\Public\Documents
\Rohde-Schwarz\Vna\Calibration\Kits\ZCAN.ck'
Load the previously created R&S ZVR cal kit file
ZCAN.ck
from
the default cal kit directory.
MMEM:STOR:CKIT 'ZCAN', 'C:
\Users\Public\Documents
\Rohde-Schwarz\Vna\Calibration\Kits\ZCAN.calkit'
Store the imported cal kit data to a VNA cal kit file
ZCAN.calkit
(assuming that the cal kit name stored in
ZCAN.ck
reads "ZCAN").
Usage:
Setting only
[SENSe<Ch>:]CORRection:COLLect[:ACQuire]
<Standard>[, <Dispersion>,
<Delay>]
Starts a calibration measurement in order to acquire measurement data for the
selected standards. The standards are reflection or transmission standards and must
be connected to port 1 or 2 of the analyzer.
Tip:
[SENSe<Ch>:]CORRection:COLLect[:
to obtain measurement data at arbitrary analyzer ports.
Suffix:
<Ch>
.
Channel number of the calibrated channel.
VNA Command Reference
www.allice.de
Allice Messtechnik GmbH