Chapter 11
Page no. 1766
SC-PM-A-001.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Scenario PM A001 - Planned Maintenance Steering Guide
2
ACTIONS PRIOR TO PM VISIT
•
Check that any applicable mandatory FMIs have been carried out.
Refer to
Product history and compatibility
.The following list may not be complete:
•
Carry out the following tasks in preparation for the visit:
FMI
Required
Applied
FMI 12083 - Reliability for FB images in Stereotaxy
FMI 12075 - Safety : AWS 43.10/53.10
Task Title
Task Definition
Obtain site status information and error logs
Job Card PM A101 - Site Status:
Analyze AWS Error Codes
ERR SUB A005 - AWS Error Messages:
Analyze IDC Error Codes
ERR SUB A007 - IDC Error Messages:
Analyze Gantry Error Codes
ERR SUB A003 - Gantry Error Messages:
Analyze Generator Error Codes