2-4-3.
Job Card and Scenario Categories
Category definition
Scope
JC
code
SC
code
Pre-installation
Includes wall, ceiling, and floor preparation, electrical
cabling, etc.
PRE
PRE
System Physical Installation
First
installation on Customer site – Physical installation
step = without powering-on the equipment.
PHY
PHY
System Electrical Installation
First
installation on Customer site
Starts with powering on the system – ends with cleaning the
equipment, the room, and putting all into order.
ELE
ELE
Upgrade
Describes installation of an option or application of an FMI
on an existing functional system, i.e., a change to the config-
uration of the system.
UPG
UPG
Corrective maintenance:
CM
Configuration (HW & SW),
Describes procedures for configuration of hardware and/or
software. Restore procedures are considered as configura-
tion; JCs describing backup and restore are also classified
as CFG.
CFG
N/A
Calibrations and adjustments
Describes calibration and adjustment procedures.
CAL
N/A
Tool
Describes the connection and use of a measuring tool
TOOL
N/A
Functional and performance
checks
Describes checks used to confirm correct global operation of
the system after an installation or repair action has been
performed.
VF
N/A
Functional and performance
checks for specific regulations
Equivalent to VF, but applies to a specific case of verifying
compliance to one standard or regulation.
REG
N/A
Image Quality performance
checks
Equivalent to VF, but applies to the specific case of verifying
Image Quality performance.
IQ
N/A
Diagnostics
= diagnose only
Used when a problem has been identified, and it is required
to locate the root cause or to choose between different root
causes. May also be used to describe the use of diagnostic
software tools.
DIAG
N/A
Trouble shooting
= di repair
Gives general guidance for a diagnostic and repair strategy
in a certain context (i.e., a certain combination of symp-
toms).
TSG
N/A
Disassembly/Reassembly
Describes removal and reinstallation of a component or
assembly. Does not usually include calibration and verifica-
tion procedures, but points to them.
D/R
N/A
Repair
Describes a repair procedure without disassembly/reassem-
bly for an identified problem (diagnosis already done). May
be used for a work-around or a “temporary fix”.
REP
N/A
Signature
Signature measurement, backup, and log book completion
May call a FORM type document.
SGN
N/A
Planned Maintenance
Specifies planned maintenance procedures and their fre-
quency.
PM
PM
De-Installation
Describes on-site de-installation procedures required at the
end of product life.
UIST
UIST