Job Card PHY A014 - Connect Gantry to Control Station
Page no. 455
Chapter 6
JC-PHY-A-014.fm
Job Card PHY A014 - Connect Gantry to Control Station
Chapter 6
1
SUPPLIES
None
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 30 minutes
4
SAFETY PRECAUTIONS
None
5
PREREQUISITES
None
6
PROCEDURE
6-1
Black Tubular Harness Routing
Gantry to Control Station cables are already connected in the Gantry. The harness (Control Station -
Positioner harness) leaves the Gantry through a black tubular conduit.
1. Run the cable conduit from the Gantry to the control station (through floor or wall ducting as appropri-
ate).
2. The conduit can enter the control station cabinet from either side. If it enters from the left (as viewed
from the front), it must pass through the space at the bottom of the cabinet to emerge on the right-
hand side.
3. Place all of the cables leaving the conduit under the bottom level (you will route them in the next sec-
tion).
4. Use the clamp provided to secure the conduit to the metal chassis at (A). If the conduit is too long for
the cable run, it can be cut. Take care not to damage the cables.
Note:
At this stage, all of the ca-
bles are underneath the bottom
level.
A