Chapter 9
Page no. 1078
JC-TSG-A-020.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card TSG A020 - Generator Power-Up Sequence Flow Charts
2-9
Partial Power–up Sequence – D
Check following partial power–up sequence
Close generator mains supply
switch S1 ("1" position).
200PL1 DE5 and DE5
lit, and "STOP" button
on console lit?
Yes
No
Start the power-up sequence by
pressing button on console.
After 3 seconds
200PL1 DE5, DE2
and 200PL2 DE2
all
lit?
Yes
No
Open generator mains supply
switch S1 ("0" position).
On 200PL1, reconnect XJ4,
XJ6, and XJ7.
Close generator mains supply
switch S1 ("1" position).
Mains fuses F1/F2
all OK?
Yes
No
Main power contact
K1 activated?
Yes
No
End of tests.
Start Power-up Sequence
See
Start Power-up Sequence
Change 200PL1.
Replace 300PL1 and
faulty mains fuses F1/F2.
D