GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A408 - Generator Supply Command Board 200-PL2
Page no. 1587
Chapter 9
JC-DR-A-408.fm
6-2
Installation of the Generator Supply Command board 200-PL2
1. Carefully place the new Generator Supply Command board on the Generator chassis four threads.
2. Attach the black cable (1) that you originally removed to the top left thread, and secure it by attaching
a nut (2) to the top left thread (8 mm open-ended wrench).
3. Attach the other three nuts (3) (8 mm open-ended wrench) to secure the rest of the Generator Supply
Command board to the Generator chassis.
4. Connect all the cables to the new Generator Supply Command board as summarized in the diagram
and table below.
3
1
2