GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A207 - Lift Belt
Page no. 1189
Chapter 9
JC-DR-A-207.fm
Job Card D/R A207 - Lift Belt
Chapter 9
1
SUPPLIES
2
TOOLS
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 60 minutes
4
SAFETY PRECAUTIONS
WARNING
The lift belt has a larger mechanical energy when the arm is at heights of less than the
maximum height. To minimize the risk of rapid lift belt movement due to stored mechani-
cal energy, you must ensure that the Arm is raised to its maximum height before you pro-
ceed.
WARNING
The Gantry must be powered off.
5
PREREQUISITES
•
Raise the arm to its maximum height.
•
Switch off the system power.
•
Remove the Front and Column covers for access to
the lift belt (1) (refer to
).
•
Loosen and remove the Gantry curtain (refer to
Card D/R A208 - Gantry Curtains
).
1