Chapter 9
Page no. 1232
JC-DR-A-223.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A223 - Rotation Optical Fork
6
PROCEDURE
6-1
Disassembly of the Optical Fork
1. Release the four bolts securing the lower X plate (10 mm open-ended wrench).
2. Remove the Rotation Board supporting plate
(3) (3 mm allen wrench).
3. Disconnect the rotation potentiometer cable
(2).
4. Open the cable chain to be able to rotate the
rotation board.
5. Remove the two screws securing the optical
Fork (2.5 mm allen wrench).
6. Unplug the Optical Fork cable (4).
7. Remove the Optical Fork.
2
3
4