Chapter 6
Page no. 396
JC-PHY-A-001.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A001 - Unpacking the Gantry and Generator Cabinet
the three bolts so that they are approximately 1 cm above the pallet floor. Leave the bolts threaded
into the Gantry base.
Install the long wooden ramp (7), coming from column packaging, to the side of the Gantry (right or
left).
12. Carefully roll the Gantry (along with the Generator cabinet) down the ramp and into the mammogra-
phy room.
CAUTION
Never push the Gantry covers to move the Gantry on its wheels.
Push the base, or if necessary pull on the large handle.
6-4
Accessories
The box of accessories is packed separately.
7