GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card ELE A024 - Declare Performed Procedure Step Hosts
Page no. 675
Chapter 7
JC-ELE-A-024.fm
Job Card ELE A024 - Declare Performed Procedure Step Hosts
Chapter 7
1
SUPPLIES
None
2
TOOLS
None
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 40 minutes
4
SAFETY PRECAUTIONS
No specific safety precautions are applicable.
5
PREREQUISITES
Obtain full details of the remote Performed Procedure Step (PPS) server: Application Entity Title, IP
address, and port number to be declared, from the network administrator or PPS server provider con-
cerned.
Before PPS is configured and used:
•
The
Declare Network Hosts
procedure must have been completed. See
•
If a PPS server is to be declared for RIS/image archiving, at least one DICOM remote image storage
device must be declared on the ADS. This is required so that the DICOM remote image storage
device can be associated with the remote PPS server.
•
If a PPS server is to be declared for CAD image archiving, at least one CAD system must be
declared using the service desktop CAD interface from the ADS. This is required so that the CAD
system can be associated with the remote PPS server.
•
The
Auto Push
feature must be turned on for the relevant network hosts declared in the PPS config-
uration panel. This is required so that the PPS messages can be sent to the remote servers.
Note:
For PPS messages to be sent to the remote server associated with a CAD system, the image types
pushed to the CAD system must include the raw images.