GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card LOTO A001 - Lock-Out / Tag-Out (LOTO) Procedures
Page no. 381
JC-LOTO-A-001.fm
the Generator, then disconnect this connection and secure it with a yellow box.
8-4-2
Isolating the Room Lamps power source
You must locate and isolate the power source of the room lamps that route electrical enegry into the
Relay Board on the Generator. The room lamps power source can vary in different hospitals, but typi-
cally you will need to cut the power source circuit breaker or isolator.