Chapter 9
Page no. 1238
JC-DR-A-224.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A224 - Gas Spring for Rotation Worm Gear
5. Place the mouting plate back on to its mounting place in the Gantry. Ensure that the bottom end of
the new Gas Spring is centered on the felt disk (7).
CAUTION
Take care to ensure that the new Gas Spring does not fall out of the mounting plate, during
the handling of the mounting plate.
Do NOT adjust the positions of the large allen screw (8) and column (9) which accomo-
dates the Gear Gas Spring.
6. Gently push on the column (9) to compress the Gas Spring against the felt disk, and insert the two
rear allen screws (10). Apply blue Loctite 243 to secure the thread of the two rear allen screws.
7. Apply blue Loctite 243 to secure the thread of the two front allen screws (11). Fully tighen both front
(11) and rear (10) allen screws (4 mm allen wrench). Use a torque wrench to ensure that the four
allen screws securing the mounting plate are tightened to 5.5 Nm.
7
COMPLETION
None.
9
8
7
10
10
11