Scenario PRE A003 - Installation Planning Visit
Electrical requirements
11 Check that room power supply require-
ments will be met.
Chapter
, section
Electrician
12 Check the line voltage specification.
, section
Electrician
13 Check the line frequency specification.
Chapter
, section
Electrician
14 Check the kVA load characteristics.
, section
Electrician
15 Check the line impedance.
Chapter
, section
Electrician
16 Check the main circuit breaker characteris-
tics.
Chapter
, section
Electrician
Door protection switches
17 Specify the requirement for provision and
connection of the door X-ray protection
switches.
Chapter
, section
Electrician
Insite connection
18 Specify requirements for Insite broadband
connection
Chapter
, section
Hospital Net-
work Adminis-
trator
Networking
19 Specify network connections and cable
runs.
Chapter
, section
Site planner
20 Allocate IP, Gateway, and Subnet mask
addresses.
Chapter
, section
Hospital Net-
work Adminis-
trator
Lighting
21 Specify requirements for dimmer switches,
drapes, etc.
Chapter
, section
Lighting spe-
cialist
#
Action
Reference
Who?