Chapter 9
Page no. 1210
JC-DR-A-210.fm
GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A210 - Gantry cover replacement guide
3-8
Installation of the Arm Cover Rework Assembly
•
The Arm Cover Rework Assembly must be installed on earlier systems to provide anchor points for
newer covers.
•
Install the assembly as described below:
1. - Screw the provided locking nut (A) onto the
threaded rod (B) of the Arm Cover Rework
Assy.
2. - Fit the rod into the lowest pair of holes in the
Arm Beam (C).
3. - Screw the two tapped fittings (D, E) onto the
ends of the rod to secure it, and use the locking
nut to lock one of them in place.
4. - Use the two M4 screws provided to secure
the Arm covers to the two tapped fittings, one
each side.
D
E
A
C
B