GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A002 - Unpacking the Control Station
Page no. 397
Chapter 6
JC-PHY-A-002.fm
Job Card PHY A002 - Unpacking the Control Station
Chapter 6
1
SUPPLIES
None
2
TOOLS
3
REQUIRED EFFORT
Personnel: 2 Field Engineers
Time: 60 minutes
4
SAFETY PRECAUTIONS
WARNING
The Control Station weighs 115 kg. Two persons are needed for unpacking and moving the
Control Station. Follow standard safety practices for handling heavy equipment.
Before moving the Control Station on its transportation wheels, ensure that the wheels are
oriented in the desired direction of movement. If not, the Control Station can tip over.
When moving the Control Station, so it cannot tip over never apply excessive force at the
top of the Control Station.
5
PREREQUISITES
None
6
PROCEDURE
6-1
Reception
The Control Station is delivered on a single pallet. The Gantry and Generator Cabinet are delivered on
another pallet. The radiation screen, digital detector, monitor and the accessories are delivered on pal-
lets. When a Senographe system arrives, check the entire consignment for damage according to
Card PRE A001 - Checking for Damage
Note:
The Accessories box (located in the large wooden Accessories cabinet) that is delivered with the
Senographe system contains many useful items. This box includes ADS/IDC Software, Looback
Kit, Service Documents, and Left Stop Bracket Set etc. You must never throw away any of the
items in the Accessories box as they can be required at a later date.