GE Healthcare
Senographe DS
Revision 1
Service Information and Procedures Class A 2385072-16-8EN
Job Card ELE A060 - Image Receptor Installation
Page no. 781
Chapter 7
JC-ELE-A-060.fm
Job Card ELE A060 - Image Receptor Installation
Chapter 7
1
SUPPLIES
•
Image receptor (
)
2
TOOLS
3
REQUIRED EFFORT
Personnel: 2 Field Engineers
Time: 30 minutes
4
SAFETY PRECAUTIONS
WARNING
- Power off the Gantry before disconnecting or working on the Digital Detector.
- The Digital Detector is cumbersome. Two people are required for installation (see section
). Follow standard safety practices for handling large components.
5
PRE-REQUISITES
•
The Gantry has been moved to its final position, and secured to the floor if necessary.
•
All procedures likely to require movement and disturbance in the area of the Tube and Image Recep-
tor have been completed.
•
Physical installation, inter-connection and AC connection of the Gantry, Generator Cabinet, and Con-
trol Station have been successfully completed.
5-1
Reception
The digital detector is delivered on a single pallet, along with the radiation screen, monitor and the
accessories. The Gantry and Generator Cabinet are delivered on another pallet. The Control Station is
delivered on another pallet. When a Senographe system arrives, check the entire consignment for dam-
age according to
Job Card PRE A001 - Checking for Damage
WARNING
Before installing the detector, you must leave it packed for at least one day so that it does
not suffer from condensation.