[dwklatve-120124-01.tif, 1, en_US]
Figure 9-6
Representation of the Total Vector Error
The TVE is defined as follows:
[fo_utcphi-111011-01.tif, 1, --_--]
where:
•
X
r(n)
= Real part of measured signal
•
X
i(n)
= Imaginary part of measured signal
•
X
r
= Real part of input signal
•
X
i
= Imaginary part of input signal
Variables that influence the TVE are:
•
Amplitude errors
•
Phase errors
•
Synchronization accuracy (deviation from the UTC)
Synchronization accuracy is affected by a GPS timer and the precise correction of the time delay within the
GPS receiver module, as well as by the optimal setup of the GPS antenna.
Measured Values, Energy Values, and Supervision of the Primary System
9.5 Phasor Measurement Unit (PMU)
1004
SIPROTEC 5, High-Voltage Bay Controller, Manual
C53000-G5040-C015-9, Edition 11.2017
Summary of Contents for 6MD85
Page 8: ...8 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 30: ...30 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 46: ...46 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 172: ...172 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 514: ...514 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1056: ...1056 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1092: ...1092 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1204: ...1204 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1238: ...1238 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1252: ...1252 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1256: ...1256 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...