Measured Values Grid Coupling Transformer
Measured Value Description
Primary
Secondary % Referenced to
Vact.w1
Actual voltage of winding 1
kV
V
Target voltage of the primary
system referenced to the rated
voltage
Vact.w2
Actual voltage of winding 2
kV
V
Target voltage of the primary
system referenced to the rated
voltage
ΔV act.
Voltage difference between
the target voltage and the
actual voltage
%
%
Voltage difference referenced
to the rated voltage of the
controlled winding
I load w1
Load current of winding 1
A
A
Load current referenced to the
rated current of winding 1
I load w2
Load current of winding 2
A
A
Load current referenced to the
rated current of winding 2
Vmax 1
Maximum voltage of winding 1 kV
V
Maximum voltage of winding 1
referenced to the rated voltage
of winding 1
Vmax 2
Maximum voltage of winding 2 kV
V
Maximum voltage of winding 2
referenced to the rated voltage
of winding 2
Vmin 1
Minimum voltage of winding 1 kV
V
Minimum voltage of winding 1
referenced to rated voltage of
winding 1
Vmin 2
Minimum voltage of winding 2 kV
V
Minimum voltage of winding 2
referenced to rated voltage of
winding 2
V tar.w1
Target voltage of winding 1
kV
V
Target voltage of winding 1
referenced to the rated voltage
of winding 1
V tar.w2
Target voltage of winding 2
kV
V
Target voltage of winding 2
referenced to the rated voltage
of winding 2
The function measured values Vmax 1, Vmax 2, Vmin 1, and Vmin 2 can be reset with the input indication
>Reset min./max.
.
For the grid coupling transformer, you can find the measured values under the following menu entries of the
device:
•
Main menu → Measurements → Voltage control gc → 90V V.contr.gc
•
Main menu → Measurements → Voltage control gc → Statistics → 90V V.contr.gc
Fundamental-Component Values and Power Measured Values
The fundamental-component values and power measured values are always present in the Two-winding
transformer voltage controller, Three-winding transformer voltage controller, and Grid coupling trans-
former voltage controller function groups. Furthermore, you can find the fundamental-component values
and power measured values for winding 1 and winding 2 in the Three-winding transformer voltage
controller and Grid coupling transformer voltage controller function groups. These values cannot be
deleted.
The following tables show
and
the total scope for the case in which a 3-phase voltage
measuring point is also connected.
Control Functions
6.9 Voltage Controller
SIPROTEC 5, High-Voltage Bay Controller, Manual
487
C53000-G5040-C015-9, Edition 11.2017
Summary of Contents for 6MD85
Page 8: ...8 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 30: ...30 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 46: ...46 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 172: ...172 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 514: ...514 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1056: ...1056 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1092: ...1092 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1204: ...1204 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1238: ...1238 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1252: ...1252 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...
Page 1256: ...1256 SIPROTEC 5 High Voltage Bay Controller Manual C53000 G5040 C015 9 Edition 11 2017 ...