The local backup file provides protection in case the network save fails. Revit Architecture saves up to 3 local
backup files. It purges older backup files.
The local backup file uses the same name as the project file, with a GMT (Greenwich Mean Time) date and
time stamp appended to it. For example, when you save project.rvt, Revit Architecture saves a local copy to
the Journal folder, using the file name format project_YYYYMMDD-hhmmss-mmm.rvt.
Journal Files
Journal files capture the actions taken by the software during a session of Revit Architecture, from the time
the software starts to the time it stops. These text files can be used to troubleshoot technical problems with
the software.
Revit Architecture creates a new journal file each time you use the software. The journal file with the highest
number is the most recent file. By default, journal files reside in the following location:
C:\Program Files\<Revit product name and version>\Journals
If you encounter problems during a Revit session, your support provider may ask you to send the journal
file and any backup files to help with the troubleshooting process. If you do not encounter problems during
a Revit session, the journal file is of little use and can be deleted. To automate the deletion of old journal
files, see
General Options
on page 505.
Closing Revit Files
1
Click File menu
➤
Close.
2
If you have not saved changes, Revit Architecture prompts you to save the changes. Do one of
the following:
■
To save the changes and close the project, click Yes.
■
To close the project without saving the changes, click No.
■
To cancel the Close request, returning to the open project in Revit Architecture, click Cancel.
3
If you are closing a workshared file and you have not saved changes to the central file, the
Suggest Save to Central dialog opens. See
Closing a Workshared File Without Saving to Central
on page 1205.
Refreshing the Screen
The Refresh command repaints the screen to remove any extraneous images. You do not normally need to
use this command, but it assures a clean image.
To refresh the screen, do one of the following
■
Press
F5
.
■
Click View menu
➤
Refresh.
72 | Chapter 3 Revit Essentials
Summary of Contents for 24000-000000-9860 - Revit Architecture - PC
Page 1: ...Revit Architecture 2009 User s Guide April 2008 240A1 050000 PM02A ...
Page 4: ......
Page 56: ...18 ...
Page 116: ...78 Chapter 3 Revit Essentials ...
Page 172: ...134 Chapter 4 ProjectViews ...
Page 178: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 140 Chapter 4 ProjectViews ...
Page 554: ...516 ...
Page 739: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 701 ...
Page 1004: ...966 ...
Page 1136: ...1098 ...
Page 1226: ...1188 ...
Page 1250: ...1212 ...
Page 1276: ...1238 Chapter 20 Design Options ...
Page 1310: ...1272 ...
Page 1366: ...1328 ...
Page 1406: ...1368 ...