Schedule with an Outline and Underlines
Applying a Phase to a Schedule
1
In the Project Browser, right-click the schedule name, and click Properties.
2
In the Element Properties dialog, enter values for the Phase Filter and Phase parameters.
3
Click OK.
For more information on phases, see
Project Phasing
on page 1263.
Modifying Schedules
There are various ways to modify schedules to improve the readability and to keep them up to date with
changes in your project.
Schedule Updates
All schedules update automatically when you modify the project. For example, if you move a wall, the square
footage updates in a room schedule accordingly.
When you change the properties of building components in the project, the associated schedule updates
automatically. For example, you could select a door in the project and change the manufacturer property
of it. The door schedule would reflect the change to the manufacturer property.
Editing Cells in a Schedule
You can edit the cells in a schedule by clicking in them. You can either select a value from a list (if available)
or enter text. As you add new values, they become available in that field's list.
Applying a Phase to a Schedule | 141
Summary of Contents for 24000-000000-9860 - Revit Architecture - PC
Page 1: ...Revit Architecture 2009 User s Guide April 2008 240A1 050000 PM02A ...
Page 4: ......
Page 56: ...18 ...
Page 116: ...78 Chapter 3 Revit Essentials ...
Page 172: ...134 Chapter 4 ProjectViews ...
Page 178: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 140 Chapter 4 ProjectViews ...
Page 554: ...516 ...
Page 739: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 701 ...
Page 1004: ...966 ...
Page 1136: ...1098 ...
Page 1226: ...1188 ...
Page 1250: ...1212 ...
Page 1276: ...1238 Chapter 20 Design Options ...
Page 1310: ...1272 ...
Page 1366: ...1328 ...
Page 1406: ...1368 ...