Creating a Mass Floor Schedule
After
creating mass floors
, you can create a schedule for them. Use a mass floor schedule to assign usages or
to analyze the design. If you change the shape of the mass, the mass floor schedule updates to reflect the
changes.
To create a mass floor schedule
1
Click View menu
➤
New
➤
Schedule/Quantities, or on the View tab of the Design Bar, click
Schedule/Quantities.
2
In the New Schedule dialog, do the following:
a
For Category, click Mass Floor.
b
For Name, specify the schedule name.
c
Select Schedule building components.
d
Click OK.
3
In the Schedule Properties dialog, do the following:
a
On the Fields tab, select the desired fields.
See
Selecting Fields for a Schedule
on page 128.
b
Use other tabs to specify filtering, sorting, and formatting of the schedule.
See
Specifying Schedule Properties
on page 128.
c
Click OK.
The schedule displays in the drawing area. If you included the Usage field in the schedule, you can assign
a usage to each mass floor in the schedule.
Related topics
■
Examples of Conceptual Design Analysis
on page 529
■
Schedule Views
on page 124
Creating a Mass Floor Schedule | 527
Summary of Contents for 24000-000000-9860 - Revit Architecture - PC
Page 1: ...Revit Architecture 2009 User s Guide April 2008 240A1 050000 PM02A ...
Page 4: ......
Page 56: ...18 ...
Page 116: ...78 Chapter 3 Revit Essentials ...
Page 172: ...134 Chapter 4 ProjectViews ...
Page 178: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 140 Chapter 4 ProjectViews ...
Page 554: ...516 ...
Page 739: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 701 ...
Page 1004: ...966 ...
Page 1136: ...1098 ...
Page 1226: ...1188 ...
Page 1250: ...1212 ...
Page 1276: ...1238 Chapter 20 Design Options ...
Page 1310: ...1272 ...
Page 1366: ...1328 ...
Page 1406: ...1368 ...