5
Specify sorting for the revision schedule, as follows:
a
Click the Sorting/Grouping tab of the Revision Properties dialog.
b
For Sort by, select Revision Sequence, and specify Ascending or Descending.
c
Ensure that Itemize every instance is selected.
6
Specify formatting for column headings in the revision schedule, as follows:
a
Click the Formatting tab of the Revision Properties dialog.
b
In the Fields list, select a field.
c
Specify the heading, orientation, and alignment for the field.
d
If you want to omit the selected field from the revision schedule, select Hidden Field.
Use the Hidden Field option, for example, if you want to use the field for sorting or grouping
but do not want it to display in the revision schedule.
Repeat these steps for each field in the revision schedule.
7
Specify display attributes for lines, text fonts, and schedule order and height, as follows:
a
Click the Appearance tab of the Revision Properties dialog.
b
For Build schedule, specify whether the revision schedule builds from the bottom up or
the top down.
See
Building a Revision Schedule from the Top Down or Bottom Up
on page 991.
c
For Height, specify whether the height of the revision schedule is user defined (fixed) or
variable.
See
Defining the Height of the Revision Schedule
on page 990.
d
Use the remaining options of the Appearance tab to define attributes for grid lines, header
text, and body text.
See
Formatting a Schedule
on page 136.
8
Click OK.
Revit Architecture creates the revision schedule and displays it in the drawing area.
9
In the Project Browser, double-click the empty node under Sheets (all).
The title block displays in the drawing area.
10
In the Project Browser, under Views (all)
➤
Schedules, select the revision schedule, and drag it
to the drawing area.
11
Place the revision schedule in the desired location on the title block.
To change the width of columns, select the revision schedule, and drag the blue triangles between
column headers.
12
(Optional) To rotate the revision schedule on the title block, see
Rotating a Revision Schedule
on page 990.
13
To save the title block, click File menu
➤
Save, specify a location and file name (if needed), and
click Save.
14
Load the title block into a project.
See
Loading a Title Block into a Project
on page 987.
Revision Schedules on Title Blocks | 989
Summary of Contents for 24000-000000-9860 - Revit Architecture - PC
Page 1: ...Revit Architecture 2009 User s Guide April 2008 240A1 050000 PM02A ...
Page 4: ......
Page 56: ...18 ...
Page 116: ...78 Chapter 3 Revit Essentials ...
Page 172: ...134 Chapter 4 ProjectViews ...
Page 178: ...Schedule with Grid Lines Schedule with Grid Lines and an Outline 140 Chapter 4 ProjectViews ...
Page 554: ...516 ...
Page 739: ...Curtain wall Curtain Grid Curtain Walls Curtain Grids and Mullions 701 ...
Page 1004: ...966 ...
Page 1136: ...1098 ...
Page 1226: ...1188 ...
Page 1250: ...1212 ...
Page 1276: ...1238 Chapter 20 Design Options ...
Page 1310: ...1272 ...
Page 1366: ...1328 ...
Page 1406: ...1368 ...