VOL.3-149
CHAPTER 2
TERMINAL-RELATED DEVICES
When Installing the DRU/DAU on the Floor using STAND ASSEM (Optional)
Marking for STAND ASSEM
START
Marking
Drilling
END
Referring to the figure below, mark the STAND ASSEM setting
locations.
Referring to the figure on the next page, drill holes at the loca-
tions marked for the STAND ASSEM.
Fasten the STAND ASSEM onto the floor.
DRU/DAU
15 ( ")
3
5
500 (1' 7 ")
7
10
15 ( ")
3
5
(3 ")
9
10
100
240 (9 ")
2
5
Wall
Unit: mm (inch)
Summary of Contents for SV8500
Page 1: ...Peripheral Equipment Description NWA 041680 001 ISSUE 12 0 FP85 110 S7 ...
Page 110: ...VOL 1 50 CHAPTER 1 DEVICES REQUIRED TO BUILD NETWORK Network Services List Box Example ...
Page 253: ...VOL 2 xiv TABLE OF CONTENTS CONTINUED Page ...
Page 292: ...VOL 2 39 Zone Transceiver ZT LEDs on the Zone Transceiver POWER STATUS Power lamp Status lamp ...
Page 1854: ...VOL 2 1601 MG SIP96 Port Settings tab opens Set the values as the following figure shows ...
Page 2721: ...VOL 3 234 CHAPTER 2 TERMINAL RELATED DEVICES Mounting of BATT BOX ASSEM Cover BATT BOX ASSEM ...
Page 3113: ...VOL 3 626 CHAPTER 4 CONFIGURATION SETUP b English Sm Lower case ...
Page 3114: ...VOL 3 627 CHAPTER 4 CONFIGURATION SETUP c Turkish Bg Upper case d Turkish Sm Lower case ...
Page 3115: ...VOL 3 628 CHAPTER 4 CONFIGURATION SETUP e Russian Bg Upper case f Russian Sm Lower case ...
Page 3118: ...VOL 3 631 CHAPTER 4 CONFIGURATION SETUP b English Sm Lower case ...
Page 3119: ...VOL 3 632 CHAPTER 4 CONFIGURATION SETUP c Turkish Bg Upper case d Turkish Sm Lower case ...
Page 3120: ...VOL 3 633 CHAPTER 4 CONFIGURATION SETUP e Russian Bg Upper case f Russian Sm Lower case ...
Page 3438: ...Printed in Japan 1307 120 ...