Appendix 1.5 Assembling
NOTE
: It is not permitted for the customer to carry out
installation at the time of delivery. For ensuring
safety and high accuracy in operation of the
instrument, installation of the instrument shall be
carried out by qualified service personnel trained
by the manufacturer or its authorized
maintenance service agent.
Appendix 1.5.1 Removal of Transport Screws
Remove the fixing brackets using a Phillips screwdriver.
NOTE
: Please do not miss and store the removed fixing
brackets carefully, for they may be used for
transportation in case of relocation of the
instrument, if any.
APPENDIX 1 - 12
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...