(8) Sample injection (INJECT switch)
Switch the injection valve to the INJECT side to load the
sample into the flow path.
Move the syringe to the top dead point after switching the
injection valve.
Buffer tube
vd :Dead volume (the instrument inside parameter)
vi :Injection volume (the sample net volume to the flow path)
vl :Lead volume (forward part, cut volume)
vr :Rear volume (rearward part, cut volume)
va :Air volume (the air volume which sample is sandwiched.)
Syringe valve
Syringe
Wash
pump
5
1
3
2
4
Plunger
wash
Waste
solution
Wash port
Sample
Rack
Wash
fluid2
Wash
fluid1
P
vl
Injection valve
Needle
From Pump To Column
Injection port
5
4
3
2
1
6
Loop
Waste
solution
Degassing unit
vi
3-way solenoid valve
Degassing
unit
2 - 21
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...