3.1.6
Washing after Use ............................................................................. 3-9
3.2 Utility
Setting
................................................................................................. 3-10
3.2.1
Setting the Offset............................................................................... 3-10
3.2.2
Setting the Time Constant ................................................................. 3-12
3.2.3
Setting the Use or Non-use of Time Program ................................... 3-13
3.2.4
Setting the Polarity ............................................................................ 3-14
3.2.5 Other
Settings ................................................................................... 3-15
3.3 GLP-Related
Functions
................................................................................. 3-21
3.3.1
Logbook of D2/W/Hg Lamp ............................................................... 3-22
3.3.2 Key
Lock............................................................................................ 3-26
3.3.3
Checking the Energy and Wavelength Accuracy of D2 Lamp........... 3-27
3.3.4
Checking the Energy of W Lamp....................................................... 3-28
3.3.5
Checking the Wavelength Accuracy with Hg Lamp........................... 3-29
3.4 Analyzing
Operation
..................................................................................... 3-30
3.4.1 Spectrum
Measurement .................................................................... 3-30
3.4.2
Setting of Recorder and Spectrum Output ........................................ 3-36
3.4.3
Operation of Marker .......................................................................... 3-38
3.4.4
Setting of Time Program.................................................................... 3-38
3.4.5
Execution of Time Program ............................................................... 3-40
3.4.6
Stop of Time Program ....................................................................... 3-40
3.4.7
Example of Time Program Operation ................................................ 3-40
3.5 Setups
............................................................................................................ 3-44
3.5.1
Selection of Communication Channel ............................................... 3-45
3.5.2
Setting of Thermostatic Flow Cell...................................................... 3-46
3.5.3
Setting of LCD Contrast .................................................................... 3-47
3.6 Before
Analysis
............................................................................................. 3-48
3.6.1
Precautions on Selection and Handling of Mobile Phase.................. 3-49
3.6.2
Characteristics of Organic Solvents .................................................. 3-53
3.6.3
Caution on Static Electricity............................................................... 3-57
3.7 Preparatory
Operation
.................................................................................. 3-58
3.7.1
Degassing and Decontamination of Mobile Phase............................ 3-58
3.7.2
Degassing of Mobile Phase............................................................... 3-59
3.7.3
Decontamination of Mobile Phase..................................................... 3-62
3.7.4 Sample
Treatment ............................................................................. 3-63
4. MAINTENANCE AND CHECKUP
............................................................................ 4-1
4.1 Confirmation of Basic Actions
..................................................................... 4-1
4.2 Confirmation of Performance Specifications
............................................. 4-2
4.2.1
Items of Performance Specification Check ....................................... 4-2
4.2.2
Measurement of Baseline Noise ....................................................... 4-3
4.2.3
Measurement of Baseline Drift .......................................................... 4-5
4.3 Periodic
Checkup
.......................................................................................... 4-7
4.3.1
Check of Liquid Leak Sensor ............................................................ 4-7
4.3.2 Periodic
Maintenance/Checkup......................................................... 4-9
- ii -
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...