3.1.2 Parameter
setting .............................................................................. 3-4
3.2 Measuring
Operation
.................................................................................... 3-6
3.2.1
Basics of Operation ........................................................................... 3-6
3.2.2 Analyzing
Operation .......................................................................... 3-12
3.3 Shutdown
Operation
..................................................................................... 3-58
3.4 Before Performing Analysis
......................................................................... 3-59
3.4.1
Selection of Mobile Phase and Cautions on Handling ...................... 3-61
3.4.2
Degassing of Mobile Phase and Wash Fluid..................................... 3-64
3.4.3
Removing Dust from Mobile Phase and Wash Fluid ......................... 3-65
3.4.4
Characteristics of Organic Solvents .................................................. 3-66
3.4.5
Cautions on Static Electricity ............................................................. 3-70
3.5 Preparatory
Operations
................................................................................ 3-71
3.5.1
Cautions on Measurement (Handling)............................................... 3-71
3.5.2 Sample
Pretreatment......................................................................... 3-72
3.5.3
Preparatory Operations of Autosampler Proper ................................ 3-73
3.6 Precautions on Handling
.............................................................................. 3-75
4. MAINTENANCE
....................................................................................................... 4-1
4.1 Checking the Performance and Specifications
.......................................... 4-1
4.1.1
Preparation of Items .......................................................................... 4-1
4.1.2
Preparation of Operation ................................................................... 4-2
4.1.3 Reproducibility
Check........................................................................ 4-5
4.2 Periodic
Maintenance
................................................................................... 4-8
4.2.1
Liquid Leak Check ............................................................................. 4-8
4.2.2
Washing the Flow Path ..................................................................... 4-8
4.2.3 Cleaning ............................................................................................ 4-9
4.2.4
Waste solution tube ........................................................................... 4-9
4.2.5
Liquid Leak Sensor............................................................................ 4-9
4.2.6 Drain
tray ........................................................................................... 4-11
4.3 Positioning the Mechanism
.......................................................................... 4-12
4.3.1
Cleaning and positioning the wash port ............................................ 4-12
4.4 Troubleshooting
............................................................................................ 4-16
4.4.1 Troubleshooting
Table....................................................................... 4-16
4.5 Error
Messages
............................................................................................. 4-19
4.5.1
Autosampler Main Unit Errors ........................................................... 4-19
4.5.2
Thermostat (Option) Errors................................................................ 4-22
5. PARTS
REPLACEMENT
......................................................................................... 5-1
5.1 Consumables and Spare Parts
.................................................................... 5-1
5.1.1 Consumables .................................................................................... 5-1
5.1.2 Spare
Parts ....................................................................................... 5-2
5.2 Fastening of SUS Pipe
.................................................................................. 5-3
5.3 Replacement of Injection Port Seal
............................................................. 5-4
5.4 Needle
Replacement
..................................................................................... 5-6
5.5 Syringe
Replacement
.................................................................................... 5-8
- ii -
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...