2 ENT
S.VALVE SEAL CHANGE (MM DD YYYY)
<1-12> 1 1 2000
Input the month of replacement.
6 ENT
S.VALVE SEAL CHANGE (MM DD YYYY)
<1-31> 6 1 2000
Input the date of replacement.
2 ENT
S.VALVE SEAL CHANGE (MM DD YYYY)
<2000–2100> 6 2 2000
Input the year of replacement.
Upon completion of all the inputs up to year,
the logbook is reset.
2010 ENT
Monitor screen reappears.
5 ENT
1 ENT
ENT or ESC
LOGBOOK (REPORT=1, RESET=2)
1
Monitor screen reappears.
WASHING PUMP LAST CHANGED DATE
23 h 1/1/2000
(continued)
(to be continued)
3 - 39
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...