5 - 14
5.7 Washing of the Check Valve (suction and discharge side)
Open the purge valve. Use isopropanol as the wash fluid.
Flow the isopropanol for 3 to 5 minutes at a maximum flow rate of
9.999 mL/min, or you may also use the purge function. If this
procedure proves ineffective, take out and wash the valve
following the procedure.
<Required Articles>
Workshop tools (P/N: 810-1353)
Wash fluid (Neutral detergent)
Ultrasonic cleaner
Beaker
Make sure the pump head lock nuts are securely tightened.
(1) Remove the inlet tube and the outlet pipe (1) from the check
valve (suction and discharge side).
(2) Loosen the check valve (suction and discharge side).
Remove them along with the valve holder using the M10
wrench.
Check valve
(Discharge side)
Check valve
(Suction side)
Outlet pipe (1)
Check valve
(Discharge side)
Check valve
(Suction side)
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...