(8) Sample injection (INJECT switch)
Switch the injection valve to the INJECT side to load the
sample into the flow path.
Move the syringe to the top dead point after switching the
injection valve.
Buffer tube
Refer to 2.3.3 Sample Injection Procedure, Cut Injection Method
Procedure (9) to (12) for completion of the analysis after this
operation.
Syringe valve
Syringe
Wash pump
5
1
3
2
4
Plunger
wash
Sample
Rack
P
Needle
Injection valve
Injection port
5
4
3
2
1
6
Loop
Wash
fluid2
Wash
fluid1
Waste
solution
Waste
solution
Wash port
From Pump To Column
Degassing
unit
3-way solenoid valve
2 - 43
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...