3.2.2 Analyzing
Operation
(1) Routine analysis operation
Make sure the pump, column, detector, data processing unit, etc.
are correctly connected, and then set the mobile phase and
detergent. Check that the waste bottle is not filled with waste
solution.
Start the pump and wait until the flow path is filled with the mobile
phase.
Turn on power supply to the autosampler. When initialization has
been normally terminated, the idle status is set and the monitor
screen appears.
STEP RACK VIAL VOL(µL) INJ TIME [I]
1 1 1 10.0 1/1 0.0 [C]
Wait until the pump, column, detector, etc. are warmed up and the
baseline becomes stable.
Press the
WASH
key to fill the syringe and wash port with
detergent.
Place the vials containing samples in the rack and position the rack
in the autosampler.
Press the
START
key to start a sequential program.
After completion of the sequential program, the monitor screen
reappears. When ALL END is set, ALL END will be displayed after
the set ALL END time.
End of analysis
NO
YES
Turn off power supply.
3 - 12
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...