- ii -
3.2 UTLTY
Setting
.............................................................................................. 3-18
3.2.1
Zero Pressure Calibration ................................................................ 3-18
3.2.2
Pump Motor Control Setting ............................................................. 3-19
3.2.3
Purging Flow Rate Setting ............................................................... 3-20
3.2.4
Flow Rate Calibration Setting ........................................................... 3-21
3.2.5
Pressure Calibration Setting ............................................................ 3-22
3.2.6
Pressure Unit Setting ....................................................................... 3-23
3.2.7
Column Flush Setting ....................................................................... 3-24
3.2.8 Event
Code
Setting .......................................................................... 3-27
3.2.9
Link Program Function ..................................................................... 3-29
3.2.10 Plunger Wash Pump Setting ............................................................ 3-38
3.2.11 Error Out Signal Setting ................................................................... 3-38
3.2.12 Leak Sensor Setting ......................................................................... 3-39
3.3 GLP
............................................................................................................... 3-40
3.3.1 Pump
Seal Logbook ......................................................................... 3-40
3.3.2 Plunger
Wash
Pump Logbook ......................................................... 3-41
3.3.3 Auto
Purge
Valve Logbook .............................................................. 3-42
3.3.4 Dynamic
Mixer Logbook ................................................................... 3-43
3.3.5 Low
Gradient
Unit Logbook .............................................................. 3-44
3.3.6 Pressure
Monitor
..............................................................................
3-46
3.3.7 Key
Lock
..........................................................................................
3-47
3.4 Analysis
Operation
...................................................................................... 3-48
3.4.1 Operation Procedure ........................................................................ 3-50
3.4.2 Analyzing
Operation
.........................................................................
3-50
3.5 Setup
............................................................................................................ 3-61
3.5.1 Pump
Mode
Setting ......................................................................... 3-61
3.5.2
LCD Contrast Setting ....................................................................... 3-63
3.6 Before Performing Analysis
........................................................................ 3-64
3.6.1
Selection of Mobile Phase and Cautions on Handling ...................... 3-66
3.6.2 Characteristics
of Organic Solvents ................................................. 3-69
3.6.3
Cautions on Static Electricity ............................................................ 3-74
3.7 Preparation
................................................................................................... 3-75
3.7.1
Degassing and Removing Dust from Mobile Phase ......................... 3-75
3.7.2
Degassing Mobile Phase ................................................................. 3-75
3.7.3
Removing Dust from Mobile Phase .................................................. 3-78
3.7.4 Sample
Pretreatment
.......................................................................
3-79
4. MAINTENANCE & INSPECTION
........................................................................... 4-1
4.1 Performance and Specifications Check
..................................................... 4-1
4.1.1 Performance
Check Preparation ...................................................... 4-1
4.1.2 Preparing
the System for Operation ................................................. 4-2
4.1.3
Flow Rate Precision Check .............................................................. 4-5
4.2 Periodic
Maintenance
.................................................................................. 4-7
4.2.1
Liquid Leak Sensor Check ............................................................... 4-7
4.2.2 Periodical
Inspection
........................................................................
4-9
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...