- iii -
4.3 Troubleshooting
.......................................................................................... 4-11
4.3.1
Error Messages and Proper Measures ............................................. 4-11
4.3.2 Troubleshooting ............................................................................... 4-13
4.4 Maintenance
................................................................................................. 4-15
4.4.1 Fluctuation, Noise, and Drift of Baseline .......................................... 4-15
4.4.2 Abnormal
Pressure .......................................................................... 4-16
4.4.3 Poor
Sensitivity, Poor Separation, Poor Reproducibility ................... 4-17
4.5 General Cautions for Handling
................................................................... 4-18
5. PARTS
REPLACEMENT
........................................................................................ 5-1
5.1 Pump Main Unit
........................................................................................... 5-1
5.2 Flow Path Tubing Parts
............................................................................... 5-3
5.3 Replacement of Pump Seal
......................................................................... 5-5
5.4 Replacement of Purge Valve Seal
.............................................................. 5-9
5.5 Washing of the Flow Path Filter
................................................................. 5-10
5.6 Washing of the Solvent Filter
..................................................................... 5-12
5.7 Washing of the Check Valve (suction and discharge side)
...................... 5-14
5.8 Parts Replacement for the Check Valve (suction and discharge side)
.... 5-17
5.9 Parts Replacement for the Plunger Wash Mechanism
............................. 5-20
5.10 Parts Replacement for the Auto Purge Valve
............................................ 5-24
INDEX
.................................................................................................................. INDEX-1
APPENDIX
................................................................................................. APPENDIX 1-1
APPENDIX 1. INSTALLATION
......................................................... APPENDIX 1-1
1. Unpacking
.................................................................................
APPENDIX 1-1
2. Place for Installation .................................................................. APPENDIX 1-2
3. Items to be Prepared by Customer ............................................ APPENDIX 1-3
3.1 Power Supply Arrangement ................................................ APPENDIX 1-3
3.2 Installation
Space ............................................................... APPENDIX 1-7
4. Check against Packing List ........................................................ APPENDIX 1-7
5. Assembling
................................................................................
APPENDIX 1-8
5.1 System
Power
Supply ........................................................ APPENDIX 1-8
5.2 System
Cabling .................................................................. APPENDIX 1-11
5.3 System
Tubing ................................................................... APPENDIX 1-13
5.4 GUI
Controller .................................................................... APPENDIX 1-18
5.5 Fastening between Component Units ................................. APPENDIX 1-19
APPENDIX 2. DESCRIPTION ON CONTACT SIGNAL
COMMUNICATION
.................................................... APPENDIX 2-1
1. Outline
.......................................................................................
APPENDIX 2-1
2. Contact Signals Entering the e-Line Connector ......................... APPENDIX 2-1
3. Individual Contacts of Each Unit ................................................ APPENDIX 2-3
APPENDIX 3. TERMINOLOGIES
..................................................... APPENDIX 3-1
Содержание CHROMASTER 5160
Страница 54: ...3 17 Fig 3 3b Connecting with the Chromaster 5260 Autosampler Injection valve Syringe valve Port4 ...
Страница 165: ...INDEX 3 U UI Pad 2 6 UTLTY 2 7 3 18 W Wiring covers 2 4 APPENDIX 1 19 Z Zero pressure calibration 3 18 ...
Страница 190: ...APPENDIX 3 2 Log book Means the information containing records of instrument operating conditions ...
Страница 221: ...3 1 Replacement Procedure b Replace the fuse with a new one and then attach the fuse holder by pressing it 3 2 ...
Страница 244: ......
Страница 406: ......
Страница 433: ...SAFETY 10 SAFETY SUMMARY WARNING and CAUTION Labels on Instrument 7 Before Turning on Xenon Lamp Front View ...
Страница 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Страница 1016: ......
Страница 1022: ...Sample rack A component part on which a sample is set Logbook A historical record of instrument operation APPENDIX 3 2 ...