Special Tools Required
11-297
EVAP Two Way Valve Test
A973X-041-
XXXXX
A
B
07JAZ-001000B
A973X-041-
XXXXX
A
07JAZ-001000B
• Vacuum pump/gauge, 0
30 in.Hg A973X-041-XXXXX
• Vacuum/pressure gauge, 0
4 in.Hg 07JAZ-001000B
1. Remove the fuel fill cap.
2. Disconnect the vapor line from the EVAP two way
valve (A), and connect it to a T-fitting (B) from the
vacuum gauge and the vacuum pump as shown.
3. Apply vacuum slowly and continuously while
watching the gauge. The vacuum should stabilize
momentarily at 0.8
2.1 kPa (0.2
0.6 in.Hg, 6
16
mmHg).
If the vacuum stabilizes (valve opens) below 0.8 kPa
(0.2 in.Hg, 0.6 mm Hg) or above 2.1 kPa (0.6 in.Hg,
16 mmHg), install a new valve and retest.
4. Move the vacuum pump hose from the vacuum
fitting to the pressure fitting, and move the vacuum
gauge hose from the vacuum side to the pressure
side (A) as shown.
5. Slowly pressurize the vapor line while watching the
gauge. The pressure should stabilize momentarily
above 1.0 kPa (0.3 in.Hg, 8 mm Hg).
• If the pressure momentarily stabilizes (valve
opens) above 1.0 kPa (0.3 in.Hg, 8 mmHg), the
valve is OK.
• If the pressure stabilizes below 1.0 kPa (0.3 in.Hg,
8 mmHg), install a new valve and retest.
03/07/29 09:26:29 61S0X050_110_0297
Summary of Contents for 2004 Odyssey
Page 33: ......
Page 59: ......
Page 145: ......
Page 167: ......
Page 229: ......
Page 259: ......
Page 283: ......
Page 309: ......
Page 613: ...03 07 29 09 29 07 61S0X050_140_0003...
Page 1097: ......
Page 1119: ......
Page 1363: ......
Page 1527: ...Top View 20 162 Frame Frame Repair Chart...
Page 1528: ...20 163 cont d...
Page 1529: ...Side View 20 164 Frame Frame Repair Chart cont d...
Page 1530: ...20 165...
Page 1594: ...21 63...
Page 1606: ...21 75...
Page 1677: ......
Page 1692: ...22 13 Roof REAR CONTROLLER and SCREEN With rear entertainment system...
Page 1696: ...22 17 1 2 BATTERY GROUND CABLE 3 4 5 6 ENGINE GROUND CABLE STARTER CABLE...
Page 2025: ......
Page 2439: ......
Page 2459: ......