09
10
11
12
5-15
10 x 1.25 mm
39 N·m
(4.0 kgf·m, 29 lbf·ft)
A
6 x 1.0 mm
12 N·m (1.2 kgf·m,
8.7 lbf·ft)
B
10 x 1.25 mm
59 N·m
(6.0 kgf·m,
43 lbf·ft)
10 x 1.25 mm
58 N·m (5.9 kgf·m, 43 lbf·ft)
A
6 x 1.0 mm
12 N·m
(1.2 kgf·m,
8.7 lbf·ft)
B
11. Raise the vehicle on the hoist to full height.
12. Remove the rope from the steering gearbox, and
install it on the subframe.
13. Tighten the power steering (P/S) hose clamp
mounting bolts (A), and install the harness clamp
(B).
14. Install the stiffeners.
15. Tighten the P/S hose clamp mounting bolt (A), and
install the P/S hose in the clamps (B).
(cont’d)
03/07/29 09:09:21 61S0X050_050_0015
Summary of Contents for 2004 Odyssey
Page 33: ......
Page 59: ......
Page 145: ......
Page 167: ......
Page 229: ......
Page 259: ......
Page 283: ......
Page 309: ......
Page 613: ...03 07 29 09 29 07 61S0X050_140_0003...
Page 1097: ......
Page 1119: ......
Page 1363: ......
Page 1527: ...Top View 20 162 Frame Frame Repair Chart...
Page 1528: ...20 163 cont d...
Page 1529: ...Side View 20 164 Frame Frame Repair Chart cont d...
Page 1530: ...20 165...
Page 1594: ...21 63...
Page 1606: ...21 75...
Page 1677: ......
Page 1692: ...22 13 Roof REAR CONTROLLER and SCREEN With rear entertainment system...
Page 1696: ...22 17 1 2 BATTERY GROUND CABLE 3 4 5 6 ENGINE GROUND CABLE STARTER CABLE...
Page 2025: ......
Page 2439: ......
Page 2459: ......