Maintenance-Object Repair Procedures
555-233-143
8-1266
Issue 1 May 2002
Active-Standby Peer Link Test (#888)
The Active-Standby Peer Link test is only run in a system equipped with the high-
or critical-reliability configuration. It verifies that a peer link can be set up between
the active and standby PKT-INTs. A peer link is a logical connection established
between the packet bus and an IPSI circuit pack’s Packet Interface circuit for both
active and standby IPSIs. This link forwards data and control messages between
the active and standby PKT-INT to prepare for a planned IPSI interchange. This
test not only checks the operation of setting up a Peer Link, but it also verifies that
the active and standby IPSI’s Packet Interface circuits can communicate over the
packet bus.
Although this test checks the functionality of both the active and standby Packet
Interface circuits, the test is run against the standby Packet Interface circuit.
Table 8-513.
Test #888
Active-Standby Peer Link Test
Error
Code
Test
Result
Description / Recommendation
1006,
1137
ABORT
An IPSI’s circuit pack’s Packet Interface circuit is out of service, so normal
maintenance tests do not run on this circuit pack.
1. Request a Packet Interface circuit reset using the reset packet-interface
Uc command.
For further action, see repair procedures in
Packet Interface Reset test.
1139
ABORT
The packet bus is alarmed.
1. Try to retire the alarm associated with the packet bus. Enter the display
alarms command to refer to the Alarm log.
‘‘PKT-BUS (Packet Bus)’’ on page 8-1230
2. Retry the command when the alarm associated with the packet bus is
retired.
1335
ABORT
Internal IPSI error. The Packet Interface is on the standby IPSI, so this test is
not allowed to execute.
1. To run this test on the standby Packet Interface, enter set
ipserver-interface Uc to activate it.
1336
ABORT
Internal system error.
1. To run this test on the standby Packet Interface, enter set
ipserver-interface Uc to activate it.
1337
ABORT
The test is not allowed to run since a PNC interchange is in progress. A PNC
interchange may have been initiated using the reset pnc interchange
command or as part of a recovery action.
1. Wait 3 minutes and retry the command.
Continued on next page
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...