Maintenance-Object Repair Procedures
555-233-143
8-154
Issue 1 May 2002
Table 8-58.
Test #626 Signaling Link Status Test
Error
Code
Test
Result
Description / Recommendation
1139
ABORT
The EPN’s packet bus is out-of-service.
1. Follow the repair procedures for the packet bus.
2. After completing step 1, execute the test port long UUCSSpp command
and review the results of the BRI Port Local LAN Looparound test (#618) to
verify the repair.
1141
ABORT
The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL maintenance documentation.
1187
ABORT
The circuit pack, port, or station may have been busied out.
1. Look in the Error Log for Error Type 18 (busied out) for ASAI-BD, ASAI-PT,
or ASAI-EPT.
2. If this Error Type is present for ASAI-EPT only, then use the release
station command and run the test again.
3. If this Error Type is present for ASAI-PT and ASAI-EPT, then use the
release port command and run the test again.
4. If this Error Type is present for ASAI-BD, ASAI-PT, and ASAI-EPT, then
use the release board command and run the test again.
2012
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
1113
FAIL
The signaling link is not “bound” to the adjunct. For ASAI adjuncts this error
indicates that the link is disconnected at Layer 2. Since the signaling link
associated with the endpoint has been identified by administration, the link is
only “unbound” from the endpoint when it is disconnected.
1. Execute the status bri-port UUCSSpp command and see
(ISDN-BRI Port), ABRI-PORT (ASAI ISDN-BRI Port)’’
.
PASS
The signaling link is connected at Layer 2 and “bound” to the ASAI adjunct.
Continued on next page
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...