Additional Maintenance Procedures
555-233-143
5-36
Issue 1 May 2002
Normally you should invoke only the full or supervision tests. The other options
are provided mainly for use in setting up an ATMS schedule. The tests that are
run depend on the type of TTL at the far end to which the test call is made. The
following table shows which tests are run for each type of TTL. The command
syntax is as follows:
test analog-testcal
trunkgroup#/| member#| port UUCSSpp | boardUUCSS
[full | supervision | no-selftest | no-return-loss | no-st-or-rl]
[repeat#][schedule]
Input Parameters
Different TTLs have different measurement capabilities and you will need the
following information about specific TTL types. This table does not include the
self-test nor does it distinguish between measurements for different test tone
levels.
trunk addresses
You can specify a single trunk or several trunks by using trunk, port,
or board addresses. These parameters are described in the
introduction to
‘‘Common Input Parameters’’ on page 7-6
. If you
enter a trunk-group number without a member number, every
member of the group is tested.
full
This executes the most comprehensive test call available using the
administered test set type.
“Full“ is the default.
supervision
This test takes about 10 seconds and simply confirms the presence
of testing capability at the far end.
no-selftest
This executes the full test, but skips self test sequences. This saves
about 20 seconds on the type 105 transmission test and has no effect
on type 100 and 102 transmission tests.
no-return-loss
This executes the full test but skips return loss sequences. This
saves about 20 seconds on the type 105 transmission test and has
no effect on type 100 or 102 transmission tests.
no-st-or-rl
This executes the full test but skips the self test and the return loss
sequences. This saves about 40 seconds on the type 105
transmission test and has no effect on type 100 or 102 transmission
tests.
repeat #
This specifies repeating the tests up to 99 times. The default is a
single run of the tests.
schedule
This qualifier brings up a form for scheduling execution of the test at a
later time. This is not the same as setting up an ATMS test schedule
described in
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...