Maintenance-Object Repair Procedures
555-233-143
8-660
Issue 1 May 2002
Every error condition reported by the firmware is associated with the background
tests that the firmware runs autonomously. Demand tests that are executed by
the maintenance software do not have any functionality that would effect any
additional error manipulation by the firmware. However, the Failure Audit test
(#949) affects auditing of the software error log by forcing the firmware to report
the pending errors again.
DS1 CONV circuit packs are connected to the Expansion Interface (EI) circuit
packs (TN570) and the Switch Node Interface (SNI) circuit packs (TN573) as
shown in
.
Figure 8-24.
DS1 CONV Complex and the DS1 Facilities
The DS1 CONV complex can replace fiber links between two EIs and fiber links
between an PN’s EI and an SNI. Fiber links between two SNIs and fiber links
between the IP Server Interface (IPSI) and the Center Stage Switch (CSS) cannot
be replaced by a DS1 CONV complex.
On the TN574 DS1 CONV circuit pack, one of the four DS1 facilities is used as the
primary facility (or packet facility), and it is the only facility that can carry packet
traffic besides providing circuit connections. The primary facility has 22 channels
available for circuit and packet connections. Other facilities each have 24
channels available for circuit connections. On the TN574 primary facility,
channels 1and 24 are not available for packet or for circuit connections. Channel
1 is used for excess packets traffic to prevent packet overflow that might result
from zero code substitutions. Channel 24 is the DS1 control channel that carries
control link data between the two DS1 CONV circuit packs.
Metallic or Fiber Connection
DS1CONV
DS1 Facilities
Network
EI
or
SNI
EI
DS1CONV
Metallic or Fiber Connection
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...