Maintenance-Object Repair Procedures
555-233-143
8-348
Issue 1 May 2002
2
FAIL
For the TN556 or TN2208, received a status of Level 1 Pending
Activation-Endpoint Active which indicates a problem with the BRI endpoint or
ASAI or Avaya adjunct, the wiring to the endpoint or adjunct, or the ISDN-BRI
port.
For the TN2198, received a status of Level 1 Pending Activation. U interface
up S/T interface down, which indicates a problem with the NT1 or the wiring
between the NT1 and the BRI endpoint (S/T interface).
1. As necessary, check and repair the wiring between the circuit pack and the
endpoint or adjunct. Execute the test port PCSSpp command, and review
the results of the Level 1 Status Inquiry test to verify the repair. If this test
is still failing, proceed to step 2.
2. For BRI endpoints, try replacing the BRI endpoint(s) connected to the port.
For ASAI or Avaya adjuncts, follow the recommended repair procedures of
the manufacturer for link communication problems. For the NT1, follow the
recommended repair procedures of the manufacturer. Then execute the
test port PCSSpp command, and review the results of the Level 1 Status
Inquiry test to verify repair. If this test is still failing, proceed to step 3.
3. Escalate the problem to the next tier.
3
FAIL
Received a status of Level 1 Deactivated; the port is out-of-service.
1. Issue the status bri-port PCSSpp command to verify that the service
state of the port is out-of-service. If the service state of the port is not
out-of-service, escalate the problem to the next tier. Otherwise, proceed to
step 2.
2. If the port has been placed out-of-service via the busyout port PCSSpp
command, try releasing the port by executing the release port PCSSpp
command. Then issue the test port long PCSSpp command, and review
the results of Level 1 Status Inquiry test. If this test is still failing, proceed
to step 3.
3. After executing the test port long PCSSpp command, review the results
of every test. Follow the repair procedures for any tests that fail. Verify
repair of the problem by executing the test port PCSSpp command and by
determining that the Level 1 Status test passes. If the test continues to fail
for this reason, proceed to step 4.
4. Escalate the problem to the next tier.
Table 8-147.
Test #621 Level 1 Status Inquiry —
Continued
Error
Code
Test
Result
Description / Recommendation
Continued on next page
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...