DS1-FAC (DS1 Facility)
Issue 1 May 2002
8-663
555-233-143
For a critical-reliability system (PNC duplication):
This procedure is nondestructive.
1. If the DS1 facility to be replaced is on the active PNC (its amber LED will be
on solid), first do a PNC demand interchange via the reset pnc
interchange command. (The status pnc command can also be used to
determine the active PNC.)
2. When the DS1 facility to be replaced is on the standby PNC (if the DS1
facility was originally on the standby PNC or after the PNC interchange has
finished), busyout the DS1 facility via the busyout ds1-facility command.
3. Replace the DS1 facility.
4. Release the DS1 facility via the release ds1-facility command.
Installing a DS1 Facility
Installing a DS1 facility is done in the following sequence:
1. Connect the facility.
2. Check the fiber link number via the list fibers command. Administer the
DS1 facility via the change fiber-link command. Change the
Facility
Installed
field from no to yes for the facility that is being installed.
3. Busyout the DS1 CONV circuit pack via the busyout board command.
4. Run the DS1 Facilities Connectivity test (#790) via the test board UUCSS
long command to make sure that the facilities are connected correctly.
5. Release the DS1 CONV circuit pack via the release board command.
Removing a DS1 Facility
Removing a DS1 facility is service disrupting in any system configuration
(because the DS1 facility administration is similar on both sides of the PNC on
critical-reliability systems).
This procedure is destructive.
1. Busyout the DS1 facility via the busyout ds1-facility command.
2. Check the fiber link number via the list fibers command. De-administer
the DS1 facility via the change fiber-link command. Change the
Facility Installed
field from yes to no for the facility that is being
removed.
3. Disconnect the DS1 facility (or facilities in a critical-reliability system
configuration).
Содержание S8700 Series
Страница 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Страница 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Страница 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Страница 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Страница 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Страница 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...
Страница 1121: ...CARR POW Carrier Power Supply Issue 1 May 2002 8 399 555 233 143 Figure 8 19 Power Distribution Unit J58890CH 1 ...
Страница 1447: ...E DIG RES TN800 reserve slot Issue 1 May 2002 8 725 555 233 143 E DIG RES TN800 reserve slot See ASAI RES ...
Страница 1735: ...LGATE AJ Issue 1 May 2002 8 1013 555 233 143 LGATE AJ See BRI SET LGATE BD See BRI BD LGATE PT See BRI PT ...
Страница 1846: ...Maintenance Object Repair Procedures 555 233 143 8 1124 Issue 1 May 2002 Figure 8 62 TN787 MMI MULTIMEDIA INTERFACE CIRCUIT PACK ...