1
1.4
”SIMODRIVE 611 universal E” control board
1-54
Siemens AG 2005 All Rights Reserved
SIMODRIVE 611 universal Description of Functions (FBU) – 04.05 Edition
Please proceed as follows when commissioning ”SIMODRIVE 611 uni-
versal E” using the ”SimoCom U” parameterizing and start–up tool for
the first time:
1. Power–up the drive group
2. Start SimoCom U
3. Request online operation for drive A
Operator action:
Execute the ”Search for online drives” function in the ”Start–up”
menu, and select drive A in the ”Drive and dialog browser”.
Is the ”start–up required” window displayed?
– Yes: ––> Start the drive configuration assistant
––>This means you signal the drive the existing configuration
(PROFIBUS node address, power module, motor, etc.).
– No: ––> Press ”re–configure drive” button
––> This means that you change the configuration on the control
board (PROFIBUS node address, power module, motor, etc.).
4. Execute the drive configuration, and at the end, press the ”Calculate
controller data, save, reset” button.
Note
If drive B is to be commissioned, then the points must be executed for
drive B from point 3 onwards.
Procedure when
commissioning the
drive for the first
time
1 Product Overview
01.99
10.99
! not 611u !