Installation and wiring
Removal and reinstallation of the operation panel or the front covers
FR-A800
2 - 7
2.2
Removal and reinstallation of the operation panel or the
front covers
Removal and reinstallation of the operation panel
Loosen the two screws on the operation panel. (These screws cannot be removed.)
Press the upper edge of the operation panel while pulling out the operation panel.
To reinstall the operation panel, align its connector on the back with the PU connector of the inverter,
and insert the operation panel. After confirming that the operation panel is fit securely, tighten the
screws. (Tightening torque: 0.40 to 0.45 Nm)
I002344E, I002345E
Fig. 2-4:
Removal and reinstallation of the operation panel
Summary of Contents for FR-A800
Page 2: ......
Page 4: ......
Page 22: ...Contents XVIII ...
Page 30: ...Related manuals Introduction 1 8 ...
Page 122: ...Connection of stand alone option units Installation and wiring 2 92 ...
Page 180: ...Basic operation procedure JOG operation Basic operation 4 32 ...
Page 934: ...Check first when you have a trouble Protective functions 6 46 ...
Page 1031: ...Appendix EC Declarations of Conformity FR A800 A 47 ...
Page 1032: ...EC Declarations of Conformity Appendix A 48 ...
Page 1033: ...Appendix EC Declarations of Conformity FR A800 A 49 ...
Page 1034: ...EC Declarations of Conformity Appendix A 50 ...
Page 1035: ...Appendix EC Declarations of Conformity FR A800 A 51 A 5 2 EMC Directive ...
Page 1036: ...EC Declarations of Conformity Appendix A 52 ...
Page 1037: ...Appendix EC Declarations of Conformity FR A800 A 53 ...
Page 1038: ...EC Declarations of Conformity Appendix A 54 ...
Page 1039: ...Appendix EC Declarations of Conformity FR A800 A 55 ...
Page 1040: ...EC Declarations of Conformity Appendix A 56 ...
Page 1041: ......