7B-60
AUTOMATIC TRANSMISSION
1
2
3, (a)
Hold differential assembly with soft jawed vise (1), install final
gear (2) and then tighten it with bolts (3) to specified torque.
CAUTION:
Use of any other bolts than specified ones is prohibited.
Tightening Torque
(a): 90 N·m (9.0 kg-m, 65.0 lb-ft)
INPUT SHAFT
Inspection
Visually check splines for damage and wear.
Visually check seal ring for breakage and wear.
PLANETARY GEAR
Inspection
Check each gear for damage and discoloration. Also, check if each
gear turns smoothly without making abnormal noise.
PLANETARY RING GEAR
Inspection
Visually check tooth surface for wear and damage.
Summary of Contents for RA410
Page 262: ...ENGINE MECHANICAL 6A4 3...
Page 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Page 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Page 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Page 552: ...AUTOMATIC TRANSMISSION 7B 25...
Page 553: ...7B 26 AUTOMATIC TRANSMISSION...
Page 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Page 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...