INSTALLATION
1) Install new gasket (1) to cylinder head.
2) Install exhaust manifold.
Tighten bolts and nuts to specified torque.
Tightening Torque
(a): 23 N
.
m (2.3 kg-m, 17.0 lb-ft)
3) Install pipe gasket and install exhaust pipe to exhaust manifold.
Before installing pipe gasket, check it for deterioration or dam-
age, and replace as necessary.
Tighten pipe fasteners to specified torque.
Tightening Torque
(a): 50 N
.
m (5.0 kg-m, 36.5 lb-ft)
4) Install exhaust manifold cover (1).
5) Connect heated oxygen sensor coupler (2) and clamp its wire
securely.
6) Install front bumper (refer to Section 9).
7) Connect negative cable at battery.
8) Check exhaust system for exhaust gas leakage.
1
2
6A4-22
ENGINE MECHANICAL
Summary of Contents for RA410
Page 262: ...ENGINE MECHANICAL 6A4 3...
Page 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Page 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Page 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Page 552: ...AUTOMATIC TRANSMISSION 7B 25...
Page 553: ...7B 26 AUTOMATIC TRANSMISSION...
Page 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Page 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...