INSPECTION
ROTOR
Open Circuit
Using ohmmeter, check for continuity between slip rings of rotor
(1). If there is no continuity, replace rotor.
Standard resistance: About 2.9
Ground
Using ohmmeter, check that there is no continuity between slip ring
and rotor (1). If there is continuity, replace rotor.
Slip Rings
Check slip rings for roughness or scoring. If rough or scored, re-
place rotor.
Using a vernier caliper, measure the slip ring diameter.
Standard diameter: 14.4 mm (0.567 in.)
Minimum diameter: 12.8 mm (0.504 in.)
If the diameter is less than minimum, replace the rotor.
STATOR
Open Circuit
Using ohmmeter, check all leads for continuity. If there is no conti-
nuity, replace stator.
Ground
Using ohmmeter, check that there is no continuity between coil
leads and stator core. If there is continuity, replace stator.
CHARGING SYSTEM
6H-15
Summary of Contents for RA410
Page 262: ...ENGINE MECHANICAL 6A4 3...
Page 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Page 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Page 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Page 552: ...AUTOMATIC TRANSMISSION 7B 25...
Page 553: ...7B 26 AUTOMATIC TRANSMISSION...
Page 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Page 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...