2) Install water pump to cylinder block and tighten to specified
torque.
Tightening Torque
(a): 22 N·m (2.2 kg-m, 16.0 lb-ft)
3) Connect oil pressure switch coupler and install clamp with its
harness.
(a)
(a)
4) Install A/C compressor (1) to its bracket.
5) Tighten exhaust manifold bolts/nuts to specified torque.
6) Install water pump belt (refer to WATER PUMP BELT INSTAL-
LATION).
7) Install A/C compressor belt (if equipped).
8) Fill coolant.
9) Install front bumper.
10) Connect negative cable at battery.
11) Check each part for leakage.
6B-14
ENGINE COOLING
REQUIRED SERVICE MATERIAL
MATERIALS
USE
Ethylene glycol base coolant
(Anti-freeze/Anti-corrosion coolant)
Additive to engine cooling system for improving cooling effi-
ciency and for protection against rusting.
Summary of Contents for RA410
Page 262: ...ENGINE MECHANICAL 6A4 3...
Page 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Page 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Page 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Page 552: ...AUTOMATIC TRANSMISSION 7B 25...
Page 553: ...7B 26 AUTOMATIC TRANSMISSION...
Page 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Page 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...