COOLING UNIT (EVAPORATOR)
5
5
5
2
1
4
7
5
6
8
3
1. Evaporator
2. A/C Evaporator thermistor
(Evaporator temperature sensor)
3. Expansion valve
4. Evaporator case
5. Packing
6. Drain hose
7. Air inlet door
8. O-ring
REMOVAL
1) Disconnect negative (–) cable at battery.
2) Recover refrigerant from refrigeration system by using recovery
and recycling equipment.
3) Disable air bag system, if equipped.
4) Remove heater control cable (1), main harness clamp (2) and
disconnect evaporator thermistor coupler (3).
1
3
2
5) Loosen suction hose (4) & liquid pipe (5) bolt (6).
6) Loosen cooling unit bolt, nut and screw as shown.
7) Remove cooling unit (7).
7
6
5
4
INSTALLATION
Reverse removal sequence to install cooling unit, noting the follow-
ing points.
If cooling unit or evaporator is replaced, pour 25 cc of refrigerat-
ing oil to compressor suction-side.
Install uniformly the packing (1) to installation hole as shown in
figure.
1
1B-16
AIR CONDITIONING (OPTIONAL)
Summary of Contents for RA410
Page 262: ...ENGINE MECHANICAL 6A4 3...
Page 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Page 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Page 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Page 552: ...AUTOMATIC TRANSMISSION 7B 25...
Page 553: ...7B 26 AUTOMATIC TRANSMISSION...
Page 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Page 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...