ECM/PCM POWER SUPPLY SYSTEM
MAIN RELAY
INSPECTION
1) Disconnect negative cable at battery.
2) Remove main relay (1) from fuse/relay box (2).
2
1
3) Check resistance between each two terminals as in table below.
If check results are as specified, proceed to next operation
check. If not, replace.
A
D
B
C
C
B
A
D
4) Check that there is continuity between terminals “A” and “B”
when battery is connected to terminals “C” and “D”.
If malfunction is found, replace.
6E1-60
ENGINE AND EMISSION CONTROL SYSTEM
TERMINALS
RESISTANCE
Between A and B
8
(Infinity)
Between C and D
56 – 146
at 20
_
C, 68
_
F
Summary of Contents for RA410
Page 262: ...ENGINE MECHANICAL 6A4 3...
Page 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Page 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Page 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Page 552: ...AUTOMATIC TRANSMISSION 7B 25...
Page 553: ...7B 26 AUTOMATIC TRANSMISSION...
Page 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Page 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...