3) Install generator and it’s bracket, and then adjust belt.
Refer to Section 0B.
4) Install A/C compressor, and then adjust belt.
Refer to Section 0B.
5) Connect cables, hoses, wires and couplers which were dis-
connected in removal procedure.
Adjust accelerator cable play, referring to Section 6E1.
Adjust clutch pedal free travel, referring to Section 7C (M/T).
Adjust gear select cable, referring to Section 7B (A/T).
6) Install air cleaner assembly, resonator and their hoses as pre-
viously outlined.
7) Install battery and it’s tray.
8) Install front bumper and engine hood.
Refer to Section 9.
9) Install drive shafts.
Refer to Section 4A.
10) Install right-hand stabilizer bracket and stabilizer bar.
Refer to Section 3D.
11) Install exhaust pipe.
12) Refill transmission with gear oil (A/T fluid for A/T model), refer-
ring to Section 0B.
13) Refill engine with engine oil, referring to Section 0B.
14) Refill cooling system with coolant, referring to Section 6B.
15) Upon completion of installation, verify that there is no fuel leak-
age, coolant leakage, transmission oil leakage or exhaust gas
leakage at each connection.
16) Check ignition timing and adjust it as necessary, referring to
Section 6F1.
6A4-68
ENGINE MECHANICAL
Summary of Contents for RA410
Page 262: ...ENGINE MECHANICAL 6A4 3...
Page 388: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 23 Blank...
Page 392: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 27 Fig for Step 3 2 3 1...
Page 399: ...6E1 34 ENGINE AND EMISSION CONTROL SYSTEM Fig for Step 2...
Page 552: ...AUTOMATIC TRANSMISSION 7B 25...
Page 553: ...7B 26 AUTOMATIC TRANSMISSION...
Page 663: ...BODY SERVICE 9 21 BUMPERS Front bumper Rear bumper...
Page 761: ...Prepared by Overseas Service Department 1st Ed May 1998 Printed in Japan Printing May 1999 610...